Industrial Engineering And Production Management(Mechanical Engineering ) Questions and Answers
Explanation:-
Answer: Option C. -> An activity could be decompressed to the maximum extent of its normal timeThe essential condition for the decompression of an activity is that An activity could be decompressed to the maximum extent of its normal time
Explanation:-
Answer: Option C. -> Linear programmingThe simplex method is the basic method for Linear programming.
The Simplex method is a search procedure that sifts through the set of basic feasible solutions, one at a time, until the optimal basic feasible solution is identified.
Explanation:-
Answer: Option A. -> CAM < DAMAccording to MAPI formula, the old machine should be replaced by new one when (Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM < DAM
Explanation:-
Answer: Option D. -> The turning of a job on lathe is an event whereas job turned is an activityThe performance of a specific task is called an activity.
An event is an instantaneous point in time at which an activity begins or ends.
Explanation:-
Answer: Option D. -> None of the abovePerformance Rating can be defined as the procedure in which the time study engineer compares the performance of operator(s) under observation to the Normal Performance and determines a factor called Rating Factor.
Explanation:-
Answer: Option D. -> All of the aboveThe principles of material handling are listed below:
- Keep all the handling to the minimum
- Select only efficient handling equipment
- Move the heaviest weight to the least distance