Railway Engineering(Civil Engineering ) Questions and Answers

Question 1. In a shunting signal if the red band is inclined at 45° it indicates
  1.    Stop
  2.    Proceed
  3.    Proceed cautiously
  4.    None of the above
Explanation:-
Answer: Option B. -> Proceed

Question 2. Gauge is the distance between
  1.    center to center of rails
  2.    running faces of rails
  3.    outer faces of rails
  4.    none of the above
Explanation:-
Answer: Option B. -> running faces of rails

Question 3. The nominal size of ballast used for points and crossings is
  1.    25 mm
  2.    40 mm
  3.    50 mm
  4.    10mm
Explanation:-
Answer: Option A. -> 25 mm

Question 4. The standard length of rail for Broad Gauge and Meter Gauge are respectively
  1.    12 m and 12 m
  2.    12 m and 13 m
  3.    13 m and 12 m
  4.    13 m and 13 m
Explanation:-
Answer: Option C. -> 13 m and 12 m

Question 5. Number of keys used in CST-9 sleeper is
  1.    2
  2.    3
  3.    4
  4.    none of the above
Explanation:-
Answer: Option A. -> 2

Question 6. Dog spikes are used for fixing rail to the
  1.    wooden sleepers
  2.    CST-9 sleepers
  3.    steel trough sleepers
  4.    concrete sleepers
Explanation:-
Answer: Option A. -> wooden sleepers

Question 7. Minimum depth of ballast cushion for a Broad Gauge wooden sleeper of size 275x25x13 cm with 75cm sleeper spacing is
  1.    15 cm
  2.    20 cm
  3.    25 cm
  4.    30cm
Explanation:-
Answer: Option C. -> 25 cm

Question 8. Number of dog spikes normally used per rail seat on curved track is
  1.    one on either side
  2.    two outside and one inside
  3.    one outside and two inside
  4.    two outside and two inside
Explanation:-
Answer: Option B. -> two outside and one inside

Question 9. The formation width for a single line meter gauge track in embankment as adopted on Indian Railways is
  1.    4.27 m
  2.    4.88 m
  3.    5.49 m
  4.    6.10 m
Explanation:-
Answer: Option B. -> 4.88 m

Question 10. Consider the following surveys
i) Reconnaissance survey
ii) Preliminary survey
iii) Traffic survey
iv) Location survey
The correct sequence in which these surveys are conducted before the alignment of a track is finalised is
  1.    i, iii, ii, iv
  2.    i, iii, iv, ii
  3.    iii, i, iv, ii
  4.    iii, i, ii, iv
Explanation:-
Answer: Option D. -> iii, i, ii, iv