Home
10th Grade
11th And 12th
11th Grade
12th Grade
3rd Grade
4th Grade
5th Grade
6th Grade
7th Grade
8th Grade
9th Grade
Advance Accountancy
Auditing
Computer Aptitude
Direct And Indirect Taxation
Exams
General Hindi
Indian Finance System
Information Technology And Application In Business
Macro Economics
Town Planning
Aerospace And Aeronautical
Analytical Instrumentation
Banking Awareness
Banking Exam
Biochemistry
Bioinformatics
Biology
Biotechnology
Business Statistics
C Program
C Programming
C++ Programming
Career Aptitude Test
Cell Biology
Central Superior Service (css)
Chemical Engineering
Chemistry
Civil Engineering
Commerce
Computer
Computer Fundamentals
Computer Science
Cost Accounting
Css
Database
Drug And Pharmaceutical Biotechnology
Ecat And Mcat Entry Test
Economics
Electrical Engineering
Electrical Engineering Questions
Electrical Measurement And Instrumentation
Engineering
English
English Literature
Environment Management
Environmental Biotechnology
Enzyme Technology
Financial Management And Financial Markets
Gate
General Knowledge
Graduate Assessment Test (gat)
Health And Physical
Heat Transfer
Html
Human Anatomy And Physiology
Human And Cultural Diversity
Human Resource Management
Ias
Indian Economy
Indian Economy
Indian General Awareness
Indian Geography
Indian Geography
Indian History
Indian History
Indian Polity
Instrumentation Transducers
International Relations
Java Program
Javascript
Judiciary And Law
Life Sciences
Management
Marketing And Marketing Management
Mass Transfer
Mechanical Engineering
Mechanics Of Materials
Medical Subjects
Microbiology
Networking
Php
Placement Tests
Professional Communication
Quantitative Aptitude
Reasoning Aptitude
Renewable Energy
Science
Sociology
Sql
Surveying
Total Quality Management
Uidai Aadhaar Supervisor Certification
Virology
Notificatin
Exam
Blog
Contact Us
Industrial Engineering And Production Management(Engineering > Mechanical Engineering ) Questions and Answers
Home
Topic
Engineering
Mechanical Engineering
Industrial Engineering And Production Management
Question 1.
Break-even analysis shows profit when
Sales revenue > total cost
Sales revenue = total cost
Sales revenue < total cost
Variable cost < fixed cost
Explanation:-
Answer: Option A. ->
Sales revenue > total cost
Question 2.
PERT analysis is based upon
Optimistic time
Pessimistic time
Most likely time
All of these
Explanation:-
Answer: Option D. ->
All of these
Question 3.
The appellate authority for an industrial dispute is
Management
Labour court
High court/supreme court
Board of directors
Explanation:-
Answer: Option C. ->
High court/supreme court
Question 4.
Pessimistic time is
The maximum time which an activity might require
The average time required for a job
The most probable time considering all conditions
The minimum time in which an activity can possibly be accomplished
Explanation:-
Answer: Option A. ->
The maximum time which an activity might require
Question 5.
Choose the wrong statement. Motion study is used for
Improving a work method
Improvising a work method
Designing a work method
Reducing inventory costs
Explanation:-
Answer: Option D. ->
Reducing inventory costs
Question 6.
The basic difference between PERT and CPM is that
PERT deals with events and CPM with activities
Critical path is determined in PERT only
Costs are considered on CPM only and not in PERT
Guessed times are used in PERT and evaluated times in CPM
Explanation:-
Answer: Option D. ->
Guessed times are used in PERT and evaluated times in CPM
Question 7.
Value engineering aims at finding out the
Depreciation value of a product
Resale value of a product
Major function of the item and accomplishing the same at least cost without change in quality
Break-even point when machine requires change
Explanation:-
Answer: Option C. ->
Major function of the item and accomplishing the same at least cost without change in quality
Question 8.
Product layout is employed for
Batch production
Continuous production
Effective utilization of machine
All of the above
Explanation:-
Answer: Option B. ->
Continuous production
Question 9.
Process layout is employed for
Batch production
Continuous type of product
Effective utilization of machines
All of the above
Explanation:-
Answer: Option A. ->
Batch production
Question 10.
Bar chart is suitable for
Large project
Major work
Minor work
All of these
Explanation:-
Answer: Option C. ->
Minor work